The basic steps of the feeding operation of the slitting machine

Source:     Time:2021-10-12 Hits:

In the operation of the slitting machine, the feeding step can be described as a relatively large step. First of all, because the quality of its processed products is very heavy, it needs the assistance of forklifts and other machinery and equipment. Moreover, the slitting size needs to be checked during the feeding process, so the feeding is a step with heavy workload and very strict work tasks. Next, we will carefully explain the four basic steps of the slitting machine feeding work.

 

The first step is that we have to have a dedicated person to cooperate with the forklift driver during the loading process, and keep the middle position of the steel coil material in line with the center of the slitting machine roller, and then the forklift driver slowly talks about the coil. Put down the material and fix it in position.

 

Secondly, the operator of the slitting machine should set the slitting size, and according to the size required by the customer, move the position of the slitting blade left and right to determine the exact position of the required size.

 


Thirdly, after accurate positioning, the machine's test slitting mode should be turned on for dimensional accuracy testing. If the accuracy is reached, the expansion coil data and expansion nut can be adjusted to prevent the coil from being deformed or damaged during the slitting operation. If the size does not meet the specified accuracy, you need to perform the second step to determine the size.

 

The operator should raise or lower the hydraulic jack to adjust the steel coil material to the middle of the expansion and contraction drum shaft (that is, the material can enter the expansion and contraction shaft). Adjust the movable bearing seat at the top of the uncoiler to keep it on the same level as the uncoiler.

 

After the final loading is completed, you must remember to turn on the coil material expansion handle and the safety protection device, and then start the operation.

 

The above are the four basic steps of the slitting machine feeding process, and these four steps cannot be less. It is not only related to the quality of product processing, but also to the safety of the entire processing process.

 


What we have to say when using a slitter is to operate the equipment correctly and reasonably, which is a prerequisite for ensuring the long-term stable operation of the equipment. Any excessive use and improper operation of the equipment will affect the equipment.

 

The maintenance of the slitting machine is mainly cleaning, lubricating, tightening, and adjustment and replacement of wearing parts. Cleaning is mainly for the heating parts of the equipment. There are many displacement mechanisms in the parts of the slitting machine, which require regular lubrication to prevent excessive wear. For stressed parts, regular tightening and inspection positions are required. Wearable parts such as brakes and cable passing mechanisms should be regularly adjusted and overhauled and replaced.

 

Wuxi Bangzhou Machinery Manufacturing Co., Ltd. is a company specialized in steel coil straightening machine, slitting line, cut to length line and flat bar straightening and chamfering machine. Our company is a professional slitting machine manufacturer. If you are interested in slitting machines, don’t hesitate to contact us.